Open Modal
On Air Now
Up Next

Illinois River bridge in Ottawa construction nearing completion

Veterans Memorial Bridge – Ottawa IL – PHOTO IDOT

OTTAWA – The reconstruction of the four lane Veterans Memorial Bridge in Ottawa is nearing completion. The $2.6 million repair of the Illinois 23 and 71 bridge over the Illinois River took the summer to complete. Workers removed and replaced the bridge expansion joints and patched the deck of the bridge, which was built in 1981.

Recommended Posts

Loading...